TAMPA, Florida (March 10, 2022) A multifamily residential tower in the Channelside district has reached its full height, a construction milestone celebrated in a recent topping-out ceremony hosted by general contractor Brasfield & Gorrie. After a building has topped out, construction shifts to the project’s interior.
Brasfield & Gorrie is collaborating with Daniel, a full-service real estate development, management and investment firm.
“Brasfield & Gorrie has collaborated with Daniel for nearly 40 years, and we’re grateful to continue our partnership through this project,” said Vice President and Division Manager Chris Evans. “We share a passion for building strong communities, and it’s an honor to contribute to the growth of this exciting Tampa neighborhood.”
“We are proud to have reached the significant construction milestone in topping out at 19-stories on this project”, said Daniel Vice President, Cameron Conner. “We look forward to welcoming future residents to their well-appointed and thoughtfully designed homes with best-in-class features and finishes in the heart of Tampa’s Channelside District.”
The 19-story tower will include 324 apartments, ranging from studios to two-bedroom floorplans. The property will also include a 19th floor sky deck and lounge with unobstructed views of the downtown skyline and Tampa Bay, a pool deck and an expansive fitness studio. It is located at the corner of East Twiggs and Channelside Drive, walking distance from developments such as Water Street Tampa. The project is scheduled for completion in the third quarter of 2022.